PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Intalling foam insulation and backfilling along column lines K-M Facing East (800x600).jpg Started cutting the beam pockets at Stair -4 (Roof) Facing North (800x600).jpg Started excavating for the water tie in connecting the Courthouse at Rahway Ave (800x600).jpg Derrick -7 (2nd Floor) Facing North-West  (800x600).jpg Excavation for the water tie in at Rahway Ave.  (800x600).jpg
Previous page Excavation for the water tie in at Rahway Ave.  (800x600)
Excavation for the water tie in at Rahway Ave. (800x600)